PowerPoint Presentation
Starting the Day
#2 Getting Ready To Start
This can be found on SharePoint – Department – Training – Manger Info.
The morning rally sets the tone for the day and at the end of the rally assigning employees to work in departments is a must to ensure that all departments produce goods for the day. The idea to utilize each employees time to cover what is needed. This takes planning. Let’s take a look:
1. 2. 3. 4. 5. 6. 7. 8. 9.
Henry
• Number of departments needed to be produced in 16 • Number of employees for the day 7
10. 11. 12. 13. 14. 15. 16.
The Production MOD Rally sheet to the left can really help ensure everything gets covered. Each department is broken down Daily Department , Production Standard , Store Goal and Scheduled Table Time which auto-populates after you enter the store goal.
Henry
Made with FlippingBook Online newsletter creator